70 Dart Triple Treat Build
Dash is in, interior wire harness and bulkhead in, firewall forward harness in, wilwood prop valve and line lock in place, new master cylinder bench bled and installed, transmission is in and driveshaft length is set. Windshield is going in tonight and HOPEFULLY a motor. Talked to my builder Saturday and he said today is the day. On a side note, a buddy came over and I ended up tire staking my Jeep on their lifted GMs.