Thanks I can't really see the picture good and it wont let me blow it up. what did it do?
Barry said to spray the base 24 hours after I sprayed the epoxy without sanding.
It crazed the base. Be very careful doing that.... I agree if you put a very thin sealer coat of epoxy on 24 hours before. I layed on 2 coats of epoxy (not thinned for a sealer) and it has not evaporated all the SPI reducer which reacted with the Motobase reducer causing issues.