If your pulling it all apart I'd remove and grind the kickdown band adjuster end into a 5/16 hex and be done with it, no special sockets needed. Just an idea if you're feeling adventurous!
Wish I’d thought of that. I did get the 8 point sockets for it. Have to get the end play and clutch packs right and then I’ll focus on the bands. Thank you for the cool idea.
All I know to do for the servos is tighten them to spec and loosen them. I don’t really kno the resistance or the feel of he bands without a frame of reference.