My HDK install thread.

the front of the hoop was hitting a very large sloppy factory weld. I had to grind it smooth then it fit flush.

DSCN1235_zpslityxqhx.jpg

DSCN1236_zpsghdx8zwk.jpg

Then drilled the hole. you drill 3/8 all way thru both sides of the frame. be very careful to drill straight and level.

DSCN1240_zpscwnh5lmp.jpg

the rear hoop mount was away from the frame about 3/16" so i clamped it in place with the front and upper bolts in place

DSCN1241_zpszhuyxja1.jpg

then drilled that 3/8 hole all way thru both sides of frame. once that was done i pulled the upper hoop all way back out

now you drill ONLY THE OUTSIDE HOLES TO 1/2"

DSCN1242_zpsggkye6yv.jpg

then you slide the supplied sleeves into place and bolt thru them. this effectively creates a sleeved hole thru the frame so that you dont collapse the frame rail when you tighten the bolts.

DSCN1243_zpsnw6qbx0b.jpg

now you can reinstall the hoop

DSCN1244_zpsvhnofltm.jpg

then i installed the upper control arms. I used one aluminum spacer per side of the bushings.

DSCN1249_zpsqxibngsw.jpg

this is the upper in with the ride height adjustment bars in place.

DSCN1248_zpsa1q9zrs0.jpg

then i installed the spindle and tie rod end

DSCN1251_zpsey9rkfx2.jpg

DSCN1250_zpsqljvpma1.jpg

then on with the brakes.

DSCN1252_zpsxtbqqnte.jpg

that is pretty much the entire passenger side installed with one guy in about 2 hrs taking my time and reading the install guidelines several times over.