The two ammeter studs must be isolated from the cluster housing, so there must be one on the inside and one on the outside. Normally, those have one washer with a ?? step that centers in the hole. As I said (I think) earlier, with wires disconnected from the ammeter, check for continuity from the studs to cluster ground. They should be open to ground. The ammeter is in series with the hot feed