New 408 build finally started

DAA38B07-E3D7-4AF0-A10D-A44C6B5E1CE1.jpeg A406828F-7231-4B30-A158-60899F1A0922.jpeg DAE74762-1AB5-413B-9F80-55302B508E41.jpeg Well I dropped my assembly of Friday afternoon and picked it up this morning. These guys did a heck of a job getting this thing balanced for me. I’m not a machinist but the way he explained it there wasn’t an option of sticking it in a lathe and machining the counter weights down. The issue was the leading edge was heavy. I bought two of these cranks many many years ago from a shop owner that is now dead so it wasn’t a case of contacting K1 and trying to exchange it. So for a little over 300.00 it’s good and ready to put together soon. Pictures for those interested in the holes. Lol