Was a bit spent from the LH rail so I figured I'd tinker a little on the RH one while my bottle is at Airgas getting filled. Figure if I get it all prepped then all I got to do is stitch it together when I get it back. I had to cut the repair plate for the inboard side about 3/4" longer to rid myself of the birdshit welds. I prefer cleaning up the metal and hitting it with machinests dye, and scribing cut marks. Works well for me. Buttweld clamps work great too. Will edit and add pix of the other side of the RH framerail if I get it that far along tonight.