Sometime this summer is the plan. Going to the chassis shop to have the lenco mounted, firewall moved back 4" and replaced/ move the motor back 4" / add a steel mid plate and aluminum tunnel. When he is done, I will have to re-wire the car at the same time, plus getting the clutch set up correct, so it should be ready by October/ November .