I got some work done on the front end today. I was able to bolt up the K member and get that torqued. Then, I assembled the front suspension. Everything went really well. Tomorrow I’ll install the original torsion bars while I wait on the 1.14” bars I ordered. Then I’ll pack the wheel bearings and get the hubs on. I have to open up the center bore on the outside of my wheels and then it will be a roller again.