before the axle turn downs

little update
I think I'm 80% done here

I got the pipes cut down and the mufflers moved up to where I want them
of course, the second one i cut before the bend, so i got to weld that back on and cut it again

when the tips come in on friday I'll do the final alignment and install the hangers
I think I might be able to pull one of the front spring perch bolts out on each side to bolt the hangers down with

the pic with the pipe sticking out the side is just a scrap piece to show where the tip will end

as you can tell I also had to adjust both 45s to suit me a bit better
didnt go to bad considering I was using just a little fluxcore welder

20200401_151841.jpg

20200401_151950.jpg

20200401_163456.jpg

20200401_164234.jpg

20200401_160930.jpg

20200401_161250.jpg