Stop in for a cup of coffee

When I changed to the larger throttle body I now get to fabricate a new CAI. I need to fabricate both a reduction in size and a thirty degree angle in the dangle to get it to fit. Total PITA. Once I get it welded out, and it fits , I will do cover passes to make it pretty then hydro dip it.

1025A37B-CDFD-4DED-9150-9E6D34217A1A.jpeg

D72A8545-CE10-49DB-90A5-43AF53E56D84.jpeg

B046D628-9104-48E2-8167-0026269C8B20.jpeg