Stop in for a cup of coffee

You got me curious so I just went and measured. The entire pile is 73” long, 37” wide and 24” tall.

Here is a quart of motor oil in front to give some perspective...

View attachment 1715545363

Just for general information, solid rock, concrete, asphalt are right about 2 ton/cu yd. Loose aggregates, sand, crushed rock, road base vary all over the place usually between 1 1/2 and 1 3/4 ton/cu yd. Moisture has a big hand in the weight like your butcher when he puts his thumb on the meat scale :lol:.