Let's do it!!! Mopar Motor Monday!

Mopar Motor Monday, here we go.

Put the valve train together on this '91 318 Roller engine I am building.

Primed the oil system, installed distributor drive gear, bolted down snd sealed the intake manifold, installed distributor. Puting the valve cover gaskets on tomorrow and bolt a coil onto the manifold and it is about ready for the engine run stand to fire it up.

So yeah have steel on hand here and next thing is to build up the engine run stand. Want to get them fired up, all tuned and dialed in on an engine run stand. Then they are ready to put to use.

20200622_150337.jpg

20200622_170423.jpg

20200622_172635.jpg

20200622_174956(0).jpg

20200622_184948.jpg

20200622_190200.jpg

20200622_191217.jpg

Ready for Engine Run Stand Next