Funny you mention that, I just got home from working my shift in an underground 100 meter rifle range. My entire shift I was looking at it trying to figure out ways to reduce construction costs and what I would do differently.
My first thought is a trench and 8’ diameter precast reinforced concrete culvert pipes. Then seal and back fill with 18” of the pipe above grade. Add a roof, side lights and flat floor.