Stop in for a cup of coffee

After dinner we went out and worked in a shed. Double 2x4 arond bottom was all rotten. Replaced with treated 4x4. Had to jack, block and cut nails off.
Now its sitting on the 4x4’s. Screw it together tomorrow. frame front wall and install roll up door. Then drag it into place next to the other shed and place 4” of gravel in it. Then metal siding.