I'll repurpose the lift circuit for the welder, as it's going to be a couple years before the lift comes in.
Meter base is installed, and power wire run to the new house. They were even nice enough to install the breaker box I bought. They also got the gutters on the house. Inspection for the meter base is scheduled Monday. as long as it passes, I can start installing the lighting. Concrete is scheduled for the 17th. Gutters for the shop about the same time. Doors go in after concrete.