stuff you're doing while at home

the rain stopped mid morning so i cut and fitted the rest of the cladding to the front around the doors and cut ridge tins from leftover cladding and fitted them. then i fitted some leftover battens either side of the 2 doors as trim pieces to neaten up the gap from door frames to cladding. lastly i fitted 2 bolts inside the up and over door for extra s4ecurity and fitted the gate catch and long padbolt to the new big gates.

IMG_0003 (1).JPG

IMG_0005.JPG

IMG_0006.JPG

IMG_0007.JPG