I’m pretty much done with sheet metal work for now except for the rear wheel tubs; I’m going to set up the suspension first. I started on the front and when I get a helper for the axle I’ll do the rear. Here’s what I got over the past 3 days:
The shock was bottoming out before it hit the bump stop so I had to add a 1.5” cap on top of the mount to raise it up a bit. I’m very happy with how it all came out! This is just one side done, My brothers going to be in town so I’m going to take a break from the front and have him help me with the rear.