Transition pan, wheel houses and trunk floor installed. I will install a New AMD main floor tub after I upgrade the subframe connectors, and mod the torsion bar hoop for a 42RH O/D trans. Then I will roll down the quarter window and remove the passenger door to feed the main floor pan through.