So I decided to tackle the fab of the fwd LH framerail top cap. Same gage steel as the other piece. I decided I would weld them in at the same time when ready. Anyhoo this one has a step or joggle in the metal. How I did this was with a heavy duty shop press, 2 heavy steel plates, and thinner sheetmetal placed on top on one side and on bottom on the other taped in place with a small space between the 2 to allow the shop press to press the metal into a step or joggle. Pic #5 you can see the step in the original original piece, and the new stamped piece held under it. I was careful to not joggle the metal past the slot I cut where the side had to get bent 90° up, and bent the side up 90° afterwards. I then welded up the slot i cut for the step to be pressed, and ground a radius in it. I also picked up this duplicolor etch primer that I am liking a lot for repairs such as this. Follow along with the pix to get a better idea how this was done. I still have to clean out the inside of the framerail under where this section goes, then apply some Por15 and epoxy primer, but that wont take very long to do.