Got a bit more done today. K frame is now officially converted from 1967 slant sux to 1969 V8. The RH forward framerail repair is trimmed to exact size, and holes located for the overflow bracket mount. Will be tack welding 1/4-20 nuts to the backside of the repair piece before final installation.