4-post lift and concrete floor finally finished

Unfortunately I have so much "stuff" that I had to have the concrete floor done in three stages, and move a lot of it from one side of the building to the other while each slab was poured. No place to put it other than outside, so I would have had to tarp over everything. It just wasn't practical to seal it too (not to mention the additional expense, good sealer is not cheap) since each part would have to cure before it could be sealed...
The other problem is that the sliding barn doors are not airtight and dust inevitably blows inside with the winds. So I'll be sweeping and shop-vacing periodically anyway.
Anyhow, a smooth concrete floor beats the heck out of a damp dirt floor :)