Starting on the upgraded 2x3 subframe connectors. RH one roughed in. Made it easier to copy the LH one as a mirror opposite. That went a lot faster. I figure it's best to get these done before I put the floor down. I will have to cut slots in the rear foot well for em, but they will only protrude about 1/2". Nothing a little extra padding on either side of em wont fix.