BP is not selling their basic block rebuilds anymore but concentrating on their fully dressed engines. I ordered a 408 back in Feb, and it is supposed to be shipped the end of the month. 12 weeks (closer to 16). Local shop wants 2500 labor to build an engine and the SCAT rotating engine kit I wanted was around 3K. Local shop was also 4 months lead time.