Got all the places welded up. stripped both sides all along the bottom making sure we got everything. Also found a little bit of thin metal starting to pepper in the Passenger floorboard, so we put in a floor pan over there. we fixed the leak also....I prepped the frame rail inside with rust preventer, and the top with weld through Primer, rustproofing on the bottom of pan, and the top plus seam sealer. The Pan is fully Butt Welded in. Now she's off to the painter. He's going to take her down to the metal most everywhere as well. welded in