Got more engine assembly done today. Got the new pushrods and installed them. Put the rockers on and set the lifter preload (hopefully correctly). Got the timing cover and water pump on. Got the oil pump rebuilt and mounted. Got the oil pan on. The intake needs a better cleaning as does one of the valve covers. Plan to get that done next weekend along with a fresh coat of Chrysler Industrial Red and if there is time, design and build a storage/test stand.