Stop in for a cup of coffee

So per Zman request here is SITREP as of tonight, we just got back to hotel. We are working 12 hour days on apartment construction. I did not think to get any pix today so I will tomorrow. I have one last panel to fabricate then all the framing is done. With exception of cat plate (top or sill plate) on top. I will run cat plate tomorrow to tie in all the walls ensuring all of them are plumb then I will remove all the kickers holding everything square and plumb.I fabricated some brackets out of left over steel from the building kit so We have all walls but one racked to red iron. This thing ain’t going anywhere. I used 2x6 under roof truss so I can encapsulate it with sheet rock. Hopefully tomorrow I will get started on hanging elec box’s and pulling romex. I am whipped. We bought another fifty 2x4s today so I will need to rob a bank at some point. Holy crap has lumber went up.Two years ago I could have built the same thing for 1/3 the cost.