My Dad was out of town working on I 40 long ago. He was going to do some concrete in the back yard over the weekend so he told me to go see his buddy at the local Redi Mix plant to get 1 cu. yd. of rock and sand for the concrete. I was like 17 yrs old and at that time the cu. yd. to weight wasn't implanted in my brain yet. Many aggregate materials are right about 1.5 tons/yard. in his F100 shortbed. It was a wild ride back to the house :lol: