1964 Dart Grüne Hölle Road Course/Track Day/AutoX Project
5/10/20:
I got All the Underfloor Welding Done! YAY.
4 Torque Boxes are in, and the Connectors are all done too.
Just need to reattach the brake line and fuel line to frame and connect the E brake together, Then Paint, But I hope to do that after I begin to fit the T5 to the trans tunnel.. err the trans tunnel to the T5.
Pics:
Boxes in 4 corners.
Greg