Got the downpipes and and dumptubes mocked up and tacked jn place. Gon a have to rework the passenger side as it's giving me issues with clearance when turning.
Thought I had the hoses nailed for the radiator, got it all in and had to fight everytbing way too much to get it all in there and connected. It essentially left any and everything to deal with the radiator unserviceable should anything ever fail. And I just wasn't happy with it. So the old setup is out and a new setup is ordered that I think will orient things alot better and allot me to have the ability to work on it if ever I need to.
More wires being run, things being checked off the list and waiting on more to show up. Hoping to fire up before next weekend. Ar least briefly until the radiator shows up.