Stop in for a cup of coffee
Done for the day. Showered downstairs and enjoying some pizza and a Troegs Perpetual IPA. Got most of the needed framing added. Not 100% sure how I am getting the drain right. Doing it in PVC, so probably get a double 45 to offset it to the side and maybe a 22.5 for the tub angle. Need to add one more stud in the outside wall, so need to mess with the insulation. Also need to trim off the sheetrock up top and get some 1xs in behind it to splice on the new fill ins. Then get the level set and marked on the studs so I know how far to squish it into the mortar. Easy peasy. :realcrazy: lol