Stop in for a cup of coffee

The valve is finally here! And, I have the drain together! Fun getting the angles right- slight angle of the tub and offset for the joist using 2 45s. Was wrong first try… cut 2 spots and reconnected with couplers. Will have to check it again with a tub full going through, but it didn’t leak with a big pitcher dumped through. Joist was already notched, but I cut another 1/2”. Thinking I will plate both sides with plywood.

3D45209C-FDD3-4366-B055-B63D658BD96E.jpeg