This is where your going to feel the biggest change and bang for the buck when you do it all at once. Once you have the engine set up ready for the cam change, the head swap is (basically) on a few bolts to take out and then put back in. Heads are quickly done at this point. The longest (time wise) part of this is ether scrapping the gasket off the block or re torquing the head down.