I was able to bring it home tonight. It was great to see how Brett fabricated the gas tank tie downs, the filler panel in front of the spare tire well, various inner wheel wheel panels etc…
He added to the front of the 1/4 panel where the factory had a leaded seam to match the sill. Total hours billed were 21.5.