2 post lift install -- documented

I would think that you would have to pin those new slabs into the old slab with re-bar. Just thinking out loud.
Yes, absolutely!! I will be digging down 8 more inches below the 4” slab, then a few inches under the slab in each direction, and drilling for rebar. I will epoxy rebar into the existing slab every 8” to make a grid, although I haven’t decided the size of rebar I will need.