Took the plunge. Random pics so far not a step by step. Torque boxes, tubbing. Spring relocation kit arriving any day. Blasted areas to be worked and the torque boxes. Used UPol weldable #2 primer in those areas and the inside of the box since later I wouldn’t be able to ensure epoxy primer inside very well. The U Pol has been the best weld through I have used so far. Not one issue striking arc.