Stop in for a cup of coffee

Depending on the rock or rock and sand mixture somewhere between 1.6 and 2 tons/cu yd.
B and 1/2 here it is a mix. They give you the weigh slip when you buy it. I was surprised also. I usually get breaker rock but it dried up singe coal mines are not as busy. This size truck. I have to do at least a 30'x 12' area 3" deep at least.

12-14-Box-Dump3.jpg