Restart the rebuild

Heres pics of that wicked ridge down in the bowl. Before and after with both small and bigger stone. The goal in bowl here is to JUST smooth down to ridge and get rid of casting flaws/texture and hopefully 120 grit rolls will be smooth enough??
Thanks
Steve

20230211_103440.jpg

20230211_103458.jpg

20230211_104749.jpg