'69 Valiant 2DR Project

xn33fc2.jpgMounted the fuel regulator, boost control, and oil filter to the firewall. Fuel lines are plumbed to the lower firewall waiting for time to do hard line to the back. Boost controller lines are plumbed to wastegates.

Next on the list is making a radiator mount.