6.1 Hemi 69 Barracuda Fastback Father Son Project

Bottom side of floor/tunnel progress, a little more welding on the tunnel frame, sheet metal and trans mounting brackets, scuffed, primed and U-Pol Raptor applied.
Decided to make the tunnel top covers removeable. Drilled for 1/4-20 fasteners with nuts welded to the bottom tunnel frame.
f6PMHt6Slbup58gOJuzEBPQ=w1429-h804-s-no?authuser=0.jpg
Still a little wet in this picture. A lot less shiny when dry. See back half.
0udgd7Fzvw-RaDfCO4yeV1w=w1429-h804-s-no?authuser=0.jpg