Stop in for a cup of coffee
Got right at it this morning. Sink and side splash set and all caulked. Let that sit till at least tonight before I attach plumbing. Don’t want to bump anything out of position. Next up is caulk around shower door. Still have mirror assembly, base molding and heater sheet metal to do, plus ? Not looking for rain till 5ish, so maybe mow around the house before then. Already over 70F. :thumbsup: