1966 Dart GT-it begins

Back at it after four days of fitting and welding a large dog run with and at my son’s (fit for a grizzly bear but I tend to over build).

Made a large C clamp to help hold the connector and to move along to compress the floor to it. A lot of fitting but nothing can get that floor dow to meet it spots. And since it is on the rotisserie, piling sacks of concrete or something wont feel right. That and I will do anything to avoid welding on my back. The 5” flat bar foot used on the inner floorboard is not shown.

78F6ED35-A708-420C-9982-22B83BE80749.jpeg

741DFB8D-E660-43A5-BE54-80BCD2628E20.jpeg