70 duster project
Got the heads back from the machine guy. He ruffed in the 2.02 valves, I’m going to do some porting and he’s going to finish up the thre angle valve job.
I opened up the bowls to about 89 percent, lended them in and took care of some casting marks. I laid the short turn back a little blending it to the new bowl. Took the valve guide down a little and smoothed it out. Not a professional job I still have to smooth things out and work on the exhaust some. Then gasket match and clean up the ports