The Dust-Turd project.

Next was the belly pan and janky drop down to clear the clutch linkage.

20230429_151038.jpg

20230429_151044.jpg

20230429_151051.jpg

20230429_151057.jpg

Got the wheelie bars welded up and had to make a upper mount for them. Used the ladder bar bracket and made an adjustable upper mount so I can go up or down 3/4" if needed. 20230506_162235.jpg

20230505_110446.jpg

20230506_115240.jpg

20230506_115244.jpg

20230506_143532.jpg

20230506_162235.jpg

20230506_162242.jpg