Got to work on the removal of the inside tub for mini tub, I welded the trunk floor to the frame. I had to make a small relief cut in the pan so I could remove a bulge that was 1/4 inch from rail and 6 inches long. Doing the ss cut outs on the quarter panel really helped. I hope to get this side done by tomorrow.