Stop in for a cup of coffee
My asphalt plant had a 400' long underground tunnel for the material feeders. From the looks of it, it was made out of old railroad tank cars. Cut the ends out and welded them together. 1 long 30" wide conveyor with 6 separate materials and their little feed conveyors. It had lights and electricity in it, and sometimes that electricity was borrowed by the rockheads. They borrowed my electricity one Saturday when I wasn't there and didn't plug my de-water pump back in, needless to say the rain started and rained for 2 days before I returned. The low end of my tunnel was 4' deep in water when I got to it and my pump was under it :BangHead: We did some trading with a trucking outfit we did business with that had vacuum trucks :lol: It was only knee deep when I had to wade in there :lol: