1966/'69 A100 Twins Build

Stick a fork in it. The heavy lifting is done. Tomorrow skim the flat side extension plates with filler and a quick DA to fill the pits then a little work on the cab back wall and it time for two coats of epoxy to seal up all this filler. What a job but it will pay off in the end with a clean crisp paint job in the bed.

IMG_5685.jpeg

IMG_5686.jpeg

IMG_5687.jpeg

IMG_5688.jpeg

IMG_5689.jpeg

IMG_5690.jpeg