The beef showed up today so it looks like tomorrow morning it will be out with the old and in with the new. 31 spline true trac with 4.10’s getting replaced with 40 spline gun drilled axles, pro (big bearing pinion) 4.30’s spooled and 5/8” studs. Hopefully the weather will clear up in the next few days so I can take Fred for a rip.