1966/'69 A100 Twins Build

Easy day. Shot the last coats of 2k in the box, ready for fine blocking and then the final 2 coats of epoxy. Shot 2k on the doghouse panels for blocking and again epoxy then black single stage paint. Finished up the filler work on the back of the doghouse and batter box where I had to weld up a hole that was punched in it. Ready for the same treatment as the other panels. Blocked out the LH side to see where we were after it has sat for a month. I thought it was a bit closer than it was but nothing a shot of epoxy and a morning of glaze can’t solve.

IMG_5918.jpeg

IMG_5919.jpeg

IMG_5920.jpeg

IMG_5921.jpeg

IMG_5923.jpeg

IMG_5924.jpeg

IMG_5925.jpeg

IMG_5926.jpeg

IMG_5927.jpeg

IMG_5928.jpeg