US Car Tool Torque Boxes and Sub Frame Connectors Install

I tacked mine to the floor with a tack every 1/4 inch or so. Fully welded front and rear frame rails. I ran panel bond over the seams to seal them then epoxy primed.

Epoxy Prepped Underneath 3.jpg